Defence Ministry Clears the BRO Tunnel Under Shinkun La in Ladakh

SHARE:

Rajnath singh took a decision of shorter 4.5km tunnel proposal of BRO but it can't be issued as top officials of the project were hit by COVID-19.

The proposed 4.25-kilometre tunnel under the 5,091-metre-high Shinkun La pass will create all-weather axis from Manali to Leh via Darcha-Padun-Nimmu alignment to supply Indian Army formations in Ladakh sector


Cutting through the red-tape, the Union defence ministry has decided to ask the Border Roads Organisation (BRO) to build a 4.25-kilometre tunnel under the 5,091-metre-high Shinkun La pass to make an all-weather axis from Manali to Leh via Darcha-Padun-Nimmu alignment to supply Indian Army formations in Ladakh sector. The snow-free axis is expected to be completed by 2024.


According to South Block officials, defence minister Rajnath Singh and top officials decided in favour of the BRO proposal instead of National Highways and Infrastructure Development Corporation Limited (NHIDCL), which was recommending an altogether new road alignment with a 13.5km tunnel under Shinkun La.


“Both BRO and NHIDCL made presentations before the minister in March 2021. After studying both the proposals, the defence ministry has decided in favour of shorter tunnel. The decision could not be put on the paper as a number of senior officials involved in this project were hit by Covid-19 infection,” said a top official. The NHIDCL has been preparing detailed project report of the project since 2017, much before the Chinese Army transgressed into Ladakh in May 2020.

It is understood that the total cost of the BRO tunnel construction will be around ₹1,000 crore due to simple design and requirement of basic electromechanical fittings. The 4.25km tunnel will have longitudinal ventilation using banana fans, which require minimum electricity and operational costs.


The Darcha-Padum-Nimmu road is 297-kilometre long with 100km already converted into double lane and black-topped by the BRO last year at the height of India-China border skirmish. While the distance between Manali and Leh will remain the same with the new road, the axis will remain totally snow-free round the year allowing movement of both troops and equipment to feed Ladakh, Kargil and Siachen sectors.


The present Manali-Sarchu-Upshi-Leh road goes over four high mountain passes of around 5,000-metre in height even after construction of Atal tunnel under Rohtang pass and remains snowed for at least two to three months during winter.


The four passes on present Manali-Leh route are: Baralacha La (16500 feet), Nakee La (15547 feet), Lachung La (16616 feet) and Tanglang La (17480 feet).

Source

Support Our Journalism

India deserves fearless, independent journalism that asks tough questions and brings ground-level realities to the forefront. The Indian Hawk is committed to delivering just that — with deep analysis, field reporting, and voices that matter.

But quality journalism comes at a cost, and we rely on the support of thoughtful readers like you to keep it going.

Whether you're based in India or abroad, you can help sustain our work by becoming a subscriber or making a contribution by clicking to subscribe and support The Indian Hawk.

Subscribe to Support Our Journalism

Subscribe to Newsletters

Loaded All Posts Not found any posts VIEW ALL Continue to article Reply Cancel reply Delete By Home PAGES POSTS View All RECOMMENDED FOR YOU CATEGORY ARCHIVE SEARCH ALL POSTS Not found any post match with your request Back Home Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sun Mon Tue Wed Thu Fri Sat January February March April May June July August September October November December Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec just now 1 minute ago $$1$$ minutes ago 1 hour ago $$1$$ hours ago Yesterday $$1$$ days ago $$1$$ weeks ago more than 5 weeks ago Followers Follow THIS PREMIUM CONTENT IS LOCKED STEP 1: Share to a social network STEP 2: Click the link on your social network Copy All Code Select All Code All codes were copied to your clipboard Can not copy the codes / texts, please press [CTRL]+[C] (or CMD+C with Mac) to copy In This Story